Dropped on site this morning to find they have been busy, spoke to Mate and they said they will be pouring the concrete on Saturday morning.
Showing posts with label formwork. Show all posts
Showing posts with label formwork. Show all posts
Thursday, 12 April 2012
Wednesday, 11 April 2012
Concrete piers done and formwork started
Concrete piers were poured and they had started the formwork for the concrete slab.
Garage side
Garage Back
Portico
Sitting room
Sitting room and hot water heater
Hot water heater
Drop edge beam
Looks like an old concrete well
Left hand side of outdoor room
Right hand side of outdoor room
Not sure why this is needed in the rumpus room?
My guess is that it's for the drop edge beam.
Water tank
Outdoor room
Rumpus room
Top soil scraped for the shed slab
Subscribe to:
Posts (Atom)