20-09-2012
- Painting of ground floor render complete
- Windows cleaned, what difference this makes!
- Internal electrical fitting almost complete
|
Alarm system |
|
Butler's pantry |
|
Kitchen |
|
Not happy about the tile alignment and the door |
|
Cable from the power pole |
|
temp plumbing until the
hot water unit is installed |
Powder Room Photos
Bathroom photos
|
Manhole in the bathroom |
Ensuite
Kitchen
|
power and cat6 points |
|
nice little scratch, wonder how they will fix this? |
|
cabling for power and cat6 under the bench top |
Butler's Pantry
Laundry
Glass splashback installed, we're not that happy about the colour as it appears too light compared to the colour sample we have. We'll have to check with the builder to confirm this is the correct colour! If it is correct, I guess we we'll have to live with it. :{
|
power point in broom cupboard |
Staircase
|
Electrical sub board |
|
Spare roof tiles and ceaserstone off cuts |
Family room
Rumpus
|
pre-run speaker cables |
Garage
Massive chip missing on the slab in the garage entry!
No comments:
Post a Comment
Note: only a member of this blog may post a comment.