Before I knew it they had already scraped the site and were marking the lines for the formwork.
Mini digger in action and gravel driveway laid.
The 900mm side setback on the single storey side, looks narrow doesn't it?
The double garage
The 1500mm side setback on the double storey side
The front sitting room and portico
One of the sewer inspection points
Marking for the sewer line
Massive tree and outdoor room
The water tank
No comments:
Post a Comment
Note: only a member of this blog may post a comment.