Wednesday, 12 September 2012

Ceaserstone installed, tiling still not finished

01-09-2012
Dropped into find all the Ice Snow ceaserstone has been installed and most of the sinks have been installed except for the kitchen and the bathroom WC. I have a feeling they have totally forgotten about this as the Bathroom WC sink it's non standard. 

Powder room
1.5mm off white grout for the floor tiling and white grout for the wall tiling.

Ice snow ceaserstone and Caroma Liano Vanity Basin

We optioned for tiled kick rail for all the vanities.



Bathroom






I'm pretty sure tilers use the floor waste point as a starting point for tiling. I mean how else could you line this up any otherway?


Bathroom WC
Anyone see a problem with the photo below? Off white grout has been used on the skirting, when it should be white. It was done correctly in the Ensuite WC but not here. In addition to this the tiling for the hand basin/mirror is not complete. Can't really see it in this photo but it's the wall on the left. Also the skirting should be 200mm high as specified in the floor plans, you can't tell from this angle but that definitely isn't 200mm. An issue I will probably need to take up with Di Lorenzo.





Ensuite



Really wished we changed this window, would have preferred to have this higher and have a layer of tiling between the bathtub and the window, similar to the pic below from one of their display home, sigh! 



 
Similar issue her in the Ensuite WC tiling isn't 200mm, however grout is the correct colour though.

Recess is shower




Gap between the bathtub and vanity. What should we use this space for? 

Bermuda Square Floor waste

Portico





Kitchen
Kitchen cearserstone installed, unfortunately we didn't have time to remove the protective foam to take any decent photos. 


Island bench has a 300mm overhang (breakfast bar) on both sides with water fall edges.







The hole we didn't ask for.

We ended up going for the free water filter as a result of the stone company's mistake. Settled for the square neck tap to match the main tap. We'll also be getting two Ice Snow chopping boards for free as well.




A sample floor board in the butler's pantry

Saturday, 1 September 2012

Tiling Continues


21/08/2012
Received an update from our SS saying that tiling should be finished this week and the 1st coat of paint will start next week. This will allow them to find any imperfections in the gyprock. Sometime this week they expect the kitchen and bathroom tops (ceaserstone) to be delivered and installed. The next stage would be the finish off, plumbing and electrical fitting. If everything goes to schedule the house will be ready early November. We really hope this is true however we don't want M to rush things at the cost of workmanship.

26-08-2012
I dropped on site expecting to see all the tiling complete, only to find they still have lots to do. 

Laundry
Laundry tiling started. For some reason the colours are a bit off, tiles look a bit pink and I suspect it's the flash light deflecting from the gyprock. Either that or I have the wrong white balance settings on the camera.





   


Powder Room
Guess they can't complete the tiling until the ceaserstone is installed.






Bathroom
Most of the wall tiling is complete and waiting on vanity ceaserstone installation.






Ensuite
Ensuite floor tiling complete, wall tiling not started.



 Shower

 Toilet

Bermuda Square Floor Waste

 MSN061 Dark Latte Metallic tiles for the bathtub


Entry
Sliding door installed in the rear of Gallery.





Rainwater tank
Does this picture below look funny? I think so, as the wall on the left is where the rainwater tank is and this has been painted. The wall on the right hasn't, so this sign will need to be removed before painting.