21/08/2012
Received an update from our SS saying that tiling should be finished this week and the 1st coat of paint will start next week. This will allow them to find any imperfections in the gyprock. Sometime this week they expect the kitchen and bathroom tops (ceaserstone) to be delivered and installed. The next stage would be the finish off, plumbing and electrical fitting. If everything goes to schedule the house will be ready early November. We really hope this is true however we don't want M to rush things at the cost of workmanship.
26-08-2012
I dropped on site expecting to see all the tiling complete, only to find they still have lots to do.
Laundry
Laundry tiling started. For some reason the colours are a bit off, tiles look a bit pink and I suspect it's the flash light deflecting from the gyprock. Either that or I have the wrong white balance settings on the camera.
Powder Room
Guess they can't complete the tiling until the ceaserstone is installed.
Bathroom
Most of the wall tiling is complete and waiting on vanity ceaserstone installation.
Ensuite
Ensuite floor tiling complete, wall tiling not started.
Shower
Toilet
Bermuda Square Floor Waste
MSN061 Dark Latte Metallic tiles for the bathtub
Entry
Sliding door installed in the rear of Gallery.
Rainwater tank
Does this picture below look funny? I think so, as the wall on the left is where the rainwater tank is and this has been painted. The wall on the right hasn't, so this sign will need to be removed before painting.