Wednesday 11 April 2012

Site scrape done

Before I knew it they had already scraped the site and were marking the lines for the formwork.

Mini digger in action and gravel driveway laid.


The 900mm side setback on the single storey side, looks narrow doesn't it?


The double garage


Back of the garage.

 The rumpus room

The 1500mm side setback on the double storey side


 The outdoor room

The front sitting room and portico


One of the sewer inspection points

Marking for the sewer line

Massive tree and outdoor room

The water tank