Received a call from our SS to say that
- the window installation is now complete
- internal plumbing completed
- site cleaned up and the hebel panels will be delivered the next day
11/05/2012 and 13/05/2012
As expected they had started on the hebel panel installation and from what I can tell they've only spent a day putting these up and progress is very quick. One disappointing thing is that the builder never told us about the option of the blue wrap that goes on the building prior to bricking or in this case hebel installation. Really not happy, we just assumed this was standard building practice, if we had know we would have asked for it.
Hebel off cut, it's very light compared to brick.
Sitting room wall, nice straight lines
From left to right, gas, water and electricity
Plumbing for the hot water heater, from top to bottom, hot water, cold water and gas.
Family and rumpus room walls
Garage wall
Sitting room, yellow hose is for gas
Plumbing in the powder room and the hot water heater
Plumbing for the shower in the powder room
Plumbing for the laundry and powder room toilet
Plumbing for the butler's pantry and kitchen
Outside butler's pantry
Gas, cold water and hot water hose
Goop has be applied to protect all the windows during construction. It gives the glass a frosted look but once removed it will be clear.
rain water tap
Bathroom mixer
Kitchen island bench plumbing