10/07/2012
Got a call from our SS today, roof tiling on the garage and rumpus should be complete now and the electrical cabling can start. By late next week council inspection of the frame should commence. We will also try to organise our own independent inspector as well.
15/07/2012
Garage roof tiling complete
Rumpus and grand outdoor room tiling complete
Main board installed
Back of the main board. The large orange tube is power from the street, and the smaller orange tube runs to the sub board under the stairs. We paid extra to have a sub board installed there so this should be more convenient for access.
Location of the sub board and where all the cat6 cables run under the stairs
Butler's pantry
Kitchen
Kitchen exhaust duct, we opted for an undermount rangehood hopefully it will have enough grunt to do the job
Speaker cables for post handover installation in Kitchen
Speaker cable runs will all terminate to the Rumpus room.
Speaker cable at the back of the rumpus
Other speaker cable at the back of the rumpus
We also have two speaker cables run into the grand outdoor room
Aircon ducting in the first floor main bedroom
Bathroom toilet exhaust fan duct leading out to the eaves
Grill for the toilet exhaust fan
Grill for the powder room exhaust fan
Grill for the kitchen exhaust fan. Not sure what that little pipe that is sticking out on the left is used for? Anyone out there have any ideas? My guess it's an overflow pipe for the bathtub.