Our Metricon Nolan 41 Journey
Our Metricon Nolan 41 building experience in Sydney.
Showing posts with label
portico hand rail
.
Show all posts
Showing posts with label
portico hand rail
.
Show all posts
Monday, 1 October 2012
Power pole installed
16-09-2012
Not much to update this week other than the power pole and the portico hand rail has been installed.
Water filter has been installed too, matches the main sink tap
Older Posts
Home
Subscribe to:
Posts (Atom)